SJ62
所有照片
About this camp: This project aims to expand the mine tour route by highlighting the discharge chimney used during the mine’s exploitation from the medieval period to the 20th century. The work involves removing backfill, constructing a dry stone wall, and building a small staircase, supervised by a technical supervisor, with 4 working days per week.
Work: – Remove backfill at the top of the discharge chimney.- Construct a dry stone wall to support the vaults.- Build a small stone staircase.- Work 4 days a week from 8:30 a.m. to 12 p.m. and 2 p.m. to 5 p.m.- No specific skills required for participation.
Accommodation and Food: – Accommodation in dormitory rooms with 4 to 6 beds, equipped with mattresses, pillows, and bathroom facilities.- Meals prepared collectively, with specific dietary requests accommodated.- Participation in cleaning and tidying dining areas and kitchen is expected.
Leisure Activities: – Discover the mountain environment and its fauna and flora through hikes.- Explore the historical and cultural heritage of the region.- Participate in sporting activities such as canyoning, via ferrata, and climbing.
Start Date: 2025-08-17
End Date: 2025-08-30
Camp Code: SJ62
Extra Fee/ Camp Fee: 0
(In addition to the VolTra application fee paid through this webpage, the local workcamp organization will collect the additional “Extra Fee/Camp Fee” of the above amount from participants on the first day of the workcamp to support the operation of local projects).